Reference
Further references ARIKON Infrastructure and Environmental Technology
Freeway 11, extension/new construction
Place: A 11
Client: Landesbetrieb Straßenwesen, Niederlassung Autobahn
Time period: 2011-2012
Performance:
- 20.000 m³ top soil removal
- 12.500 m³ topsoil cover
- Install 80,000 m³ of soil
- 4,000 m infiltration ditch
- Producing 52,000 m² of ballast base layer
- Produce 34,000 m² concrete roadway (ARGE Partner)
Special services:
- 3,600 t soil improvement with lime
- 3,850 t soil consolidation with cement
- 1 A Building
- 1 passage structure
- 5 pipe jacking DN 1000
B 96a Restoration Rügendamm, Stralsund
Location: Rügendamm Stralsund
Client: Straßenbauamt Stralsund
Time period: 2011
Performance:
- 2.000 m³ topsoil works
- 18.000 m³ soil supply + installation
- 10.000 m² asphalt/roadway break-up
- 6,000 m² of asphalt pavement and roadway
- 4.000 m² asphalt pavement in sidewalks
- 2.400 m set borders
- produce 1,200 m paving strips
- 1.200 m railing disassembly, delivery + new installation
Special performance:
- 1,300 t of stone fill on hydraulic construction stone
- take up 1,200 t loaded macadam layer + store professionally
- conversion of 2 abutments of the old Rügen dam
- production of doublings
- installation of reinforcing steel manufacture of PCC layers